Category Archive: Commissioning

  1. Houston Ballet Center for Dance

    Comments Off on Houston Ballet Center for Dance

    Cx Plan, Cx Specifications, Design & Submittal Review, O&M Training, Post Occupancy Cx, Pre-Functional, and Functional Tests for the following systems:

    – Air Distribution System
    – Exhaust Hoods
    – Fire Alarm System
    – Fire Suppression/Protection Systems
    – Electrical System Power
    – Emergency Power Systems
    – Security System
    – Lighting Controls
    – Sewage Ejector System

  2. Memorial Hermann The Woodlands Hospital

    Comments Off on Memorial Hermann The Woodlands Hospital

    240,000 SF  New Construction and 47,000 SF  Renovation

    Cx Plan Development, Cx Specifications Development, Pre-Functional Inspections, Functional Test Development and Functional Test Execution, O&M Training Facilitation, and Post Occupancy Cx.

    • HVAC System:
         – Chilled Water Plant
         – Air Distribution System
    • Electrical Systems:
         – Electrical System Power
         – Emergency Power Systems
    • Life Safety Systems:
         – Fire alarm system
         – Fire Smoke/Damper

  3. alliantgroup Office Building

    Comments Off on alliantgroup Office Building

    305,000 GSF, New Construction

    Commissioning Plan Development, Commissioning Specifications Development, Pre-Functional Checklist Development, Functional Test Development, LEED® Fundamental Commissioning Services for Core and Shell

    • HVAC System:
         – Stair Pressurization Fans
    • Electrical System:
         – Switchgear, Bus Risers, Transformers and Panels, & Motor Control Centers
         – Fire Alarms
         – Lightning Protection
         – Ground Fault Protection and Setting
         – Generator, Automatic Transfer Switch
    • Plumbing System:
         – Domestic Water Pumps, Pressure Relief Valves, Water Closets and Urinals
         – Faucets and Hose Bibs
    • Fire Protection:
         – Sprinkler Controls Rigs on each Floor/Standpipe, Fire Pump and Jockey Pump, Dry Pipe System
    • Low Voltage:
         – Security Locks and Door Positioning, Cameras

  4. Hermann Park Lake Plaza

    Comments Off on Hermann Park Lake Plaza

    New Construction
    LEED BD+C: New Construction v2 – LEED 2.2, Gold Rating

    Cx Plan, Cx Specifications, Submittal Review, Energy Simulation, Post Occupancy Cx, Pre-Functional, and Functional Tests for the following systems:

    – Air Handling Unit
    – Lighting Controls
    – Electric Water Heater

  5. 2200 Post Oak

    Comments Off on 2200 Post Oak

    Core & Shell Commissioning:

    • Commissioned MEP Systems & Equipment
    • LEED® Gold Certification

    BBVA Offices – Fundamental & Enhanced Commissioning:

    • Commissioned MEP Systems & Equipment
    • LEED® CI v2009

  6. Memorial Hermann Katy Hospital

    Comments Off on Memorial Hermann Katy Hospital

    216,500 SF, New Construction

    Cx Plan Development, Cx Specifications Development, Design Review, Pre-Functional Checklist Development, Functional Test Development and Execution, O&M Training Facilitation.

    • HVAC System:
         – Chilled Water Plant
         – Hot Water Plant
         – Air Distribution System
         – Room Isolation
    • Life Safety Systems:
         – Fire Alarm System
         – Fire/Smoke Dampers
    • Electrical Systems:
         – Electrical Power Distribution Systems
         – Emergency Power Systems

  7. Hess Tower

    Comments Off on Hess Tower

    930,000 SF, New Construction – Core & Shell

    Cx Plan Development, Cx Specifications Development, Pre-Functional Checklist Development, Functional Test Development and Execution, and O&M Training Facilitation.

    • HVAC System:
         – Chilled Water Plant
         – Air Distribution System
         – Demand Control Ventilation System
    • Electrical System:
         – Lighting Controls
    • Plumbing System:
         – Domestic Hot Water System
    • Renewable:
         – Wind Turbine System

  8. Carnegie Vanguard High School

    Comments Off on Carnegie Vanguard High School

    97,000 SF, New Construction

    Cx Plan Development, Cx Specifications Development, Design Review, Submittal Review, Pre-Functional Inspections, Functional Test Development and Functional Test Execution, O&M Training Facilitation, and Post Occupancy Cx.

    • HVAC System:
         – Chiller Plant
         – Air Distribution System
    • Plumbing System:
         – Domestic Hot Water System
    • Electrical System:
         – Lighting Controls

  9. Lewis Elementary School

    Comments Off on Lewis Elementary School

    105,595 SF, New Construction

    Cx Plan Development, Cx Specifications Development, Pre-Functional Checklist Development, Functional Test Development, and O&M Training Facilitation.

    • HVAC System:
         – Chilled Water Plant
         – Air Distribution System
    • Electrical System:
         – Lighting Controls
    • Plumbing System:
         – Domestic Hot Water System

  10. Energy Center I & II

    Comments Off on Energy Center I & II

    New Construction – Core & Shell
    Phase I: 354,638 GSF, LEED BD+C: Core and Shell v2, Silver Rating
    Phase II: 320,872 GSF, LEED BD+C: Core and Shell v2, Gold Rating
    LEED Cx Services Including:
     – Owner Project Requirements
     – Cx Plan, Specifications, Pre-Functional & Functional Tests for the Following Systems:
        – Chilled Water Plant
        – Air Distribution System
        – Demand Control Ventilation System
        – Domestic Hot Water System
        – Lighting Controls

  11. The Monarch School and Institute

    Comments Off on The Monarch School and Institute

    New Construction
    LEED BD+C: New Construction v2 – LEED 2.2, Gold Rating

    LEED Cx Services Including:
      – Cx Plan, Pre-Functional, and Functional Tests for the following systems:
          – HVAC Systems
          – Lighting Controls/Daylighting
          – Domestic Hot Water System

  12. Memorial Hermann Southwest Medical Plaza IV

    Comments Off on Memorial Hermann Southwest Medical Plaza IV

    New Construction
    Fundamental Cx Services Including:
      – O&M Training
      – Design & Submittal Review
      – Cx Plan, Specifications, Post Occupancy Cx, Pre-Functional & Functional Tests for the Following Systems:
          – Chilled Water Plant
          – Air Distribution System
          – Electrical System Power
          – Emergency Power Systems
          – Fire alarm system
          – Fire Smoke/Damper