Category Archive: Interiors

  1. Macquarie Group Limited

    Comments Off on Macquarie Group Limited

    54,000 SF  Interiors Including:

    • 10,000 SF Trading Environment & Related Support Areas
    • Raised-Floor Data Center with 2N Electrical & N+1 Mechanical Systems
    • New Diesel Generator
    • New 2N Electrical System Including:
    – 80 kVA Redundant UPS
    – Fully Redundant Power Distribution System with Automatic Transfer Switches
    – Fully Redundant HVAC System
    – LAN Based Controls & Alarm System
    – VEDSA Early Smoke Detection System

  2. WorleyParsons

    Comments Off on WorleyParsons

    123,010 SF, Interior Development Including:

    • Open & Enclosed Office Space
    • 600 SF, Data Center with a Pre-Action Sprinkler System
    • IDF Room on Each Floor with 24-Hour A/C
    • 2 Coffee Bars & 2 Large Conference Rooms on Each floor
    • 800 SF, Conference/Presentation Room
    • 2 Smaller Conference Rooms Approx. 350 SF
    • Coffee Bar & Reception Area
    • LEED® CI 2.0 Gold Certification

  3. Kemira Inc. – GHQ

    Comments Off on Kemira Inc. – GHQ

    15,000 SF, New Headquarter Offices in 19-Story BriarLake Plaza II Office Building

  4. Foster Wheeler, Ltd.

    Comments Off on Foster Wheeler, Ltd.

    340,000 SF,  Interior Development Including:

    • I.T. Server Room
    • IDF Room on Every Other Floor, with 24-Hour A/C
    • 2 Copy/Coffee Areas per Level
    • Executive Offices
    • Boardroom/Conference Rooms
    • Deli
    • Support Spaces

  5. Hines Southwest Regional Office

    Comments Off on Hines Southwest Regional Office

    20,000 SF, Offices Including:

    • 400 SF, Server Room with 24/7 Air Conditioning
    • Individual HVAC Control in 2 Conference Rooms
    • Tele-Conferencing Room

  6. Barclays Capital CRES

    Comments Off on Barclays Capital CRES

    25,000 SF, Interiors Including:

    • 225 kVA UPS
    • 500 kVA Generator with H3 Fuel Storage
    • 1,800 SF Data Center & Control Area
    • Fully Redundant Power Distribution System with Automatic Transfer Switches
    • Fully Redundant HVAC System
    • LAN Based Controls & Alarm System
    • VEDSA Early Smoke Detection System

  7. Noble Energy Center – Phase I

    Comments Off on Noble Energy Center – Phase I

    Phase I – Project Renaissance

    • Approximately 500,000 SF, Interiors Development Including:
         – Enclosed Offices
         – Conference Hall
         – Storage
         – Fitness Center with Locker Rooms & Lounge
         – 3-Level Atrium
         – Full Service Kitchen & Dining Area
         – Mission Critical Response Center with Central UPS Distribution and 1 MW Generator Backup
         – 2,000 SF Data Center
    • Central Plant
    • 1,576 Car Parking Garage

  8. Memorial Hermann Support Services Relocation

    Comments Off on Memorial Hermann Support Services Relocation

    North Tower

    • Core & Shell Renovations Including:
         – New Air Handling Units
         – Electrical Panels
         – Plumbing
    • 7-Level Interior Fitout of Space for System Services Offices
    • New Chillers/Boilers to Serve Existing West Pavilion
    • Demolition of Existing Central Plant

  9. Hydro, Gulf of Mexico, LLC

    Comments Off on Hydro, Gulf of Mexico, LLC

    123,500 SF, Interior Remodel on Levels 5-9 Including:

    • 3,500 SF, Raised Floor Data Center
    • 2,500 SF, Visualization Lab
    • Board Room
    • Training Rooms
    • Executive Lounge & Conference Room
    • 4 Workstation Rooms with 24-Hour A/C
    • Reception Area
    • Large Conference Rooms & War Rooms
    • File Storage & Break Rooms on Each Level
    • Several Areas with Specialized Lighting Control & Audio/Visual Requirements

  10. Freeport LNG Development, L.P.

    Comments Off on Freeport LNG Development, L.P.

    11,083 SF,  Interior Design Including:

    • 6,000 SF, Data Center:
         – 24-Hour Air Conditioning Unit
         – New UPS
         – Chemical Fire Suppression System to Serve This Room