Category Archive: LEED

  1. 811 Main Street

    Comments Off on 811 Main Street

    1,000,000 SF  46-Story Office Tower Including:

    • A Signature Feature is a Dramatic 39th Floor Sky Garden Recessed into the Building’s Form that Reveals Planted Terraces.
    • 10 Level Parking Garage with 2 Levels Below Grade
    • LEED® Platinum Certification

  2. The DOW Chemical Company, The Texas Innovation Center

    Comments Off on The DOW Chemical Company, The Texas Innovation Center

    New Research & Development Campus Including:
    – 291,591 GSF, Wet Chemistry Laboratory Building 1
    – 277,191 GSF, Wet Chemistry Laboratory Building 2
    – Laboratory Buildings Include:
    – Lab Modules, Break Rooms, Chemical Storage, Office Space, IT Rooms & Other Miscellaneous Areas
    – 60,000 GSF, Diamond Center Amenities Building Including:
    – Fitness Center, Cafeteria, Conference Center, Training & Visitor’s Center
    – 25,000 GSF, Central Plant
    – Site & Infrastructure Work Including:
    – Roadway Lighting, Dry Utility Distribution, Central Distribution of Chilled Water, Interceptors, Canopies, Lift Station(s)
    LEED BD+C v3 Gold Rating

  3. FMC Technologies Corporate Headquarters, Generation Park

    Comments Off on FMC Technologies Corporate Headquarters, Generation Park

    New Corporate Office and Manufacturing Campus Including:

    • 360,000 GSF, Office Tower 1 Including:
         – General Office Space
         – 2,500 SF, “Grab & Go” Cafeteria
         – 825 SF, I.T. Support Space
         – 1-Level Connector to Tower 2
         – Pursuing LEED® Gold Certification
    • 180,000 GSF, Office Tower 2 Including:
         – General Office Space
         – I.T. Support Space
         – “Grab & Go” Cafeteria
         – 143,000 SF, to Remain in Shell Condition
         – Pursuing LEED® Gold Certification
    • 94,000 SF, High & Medium Bay Building
    • 29,100 GSF, Miscellaneous Specialty/Out Buildings Including:
         – X-Ray Booth
         – Paint Booth(s)
         – Wash-Up Machine(s)
         – Storage, etc.
    • 56,900 GSF, SCM Lab & Schilling Robotics Including:
         – 141,200 GSF, MMR, CP & Rental Including:
              ▸ Office
              ▸ Air-Conditioned Workshop
              ▸ Dining, etc.
    • 62,000 GSF, SDS & WFS
    • 144,000 GSF, Shared Functions Building
    • 151,000 GSF, Indoor Storage
    • 876,500 GSF, Structured, Open-Air Parking Garage Including:
         – 2,450 Spaces
    • Central Plant for the South Campus
    • Site & Infrastructure Work Including:
         – Infrastructure to Support Future Campus Development
         – Roadway Lighting
         – Dry Utility Distribution
         – Central Distribution of Chilled Water
    • SIT Slabs, Canopies, Guard Booths & Lift Station(s)

  4. Hermann Park Lake Plaza

    Comments Off on Hermann Park Lake Plaza

    New Construction
    LEED BD+C: New Construction v2 – LEED 2.2, Gold Rating

    Cx Plan, Cx Specifications, Submittal Review, Energy Simulation, Post Occupancy Cx, Pre-Functional, and Functional Tests for the following systems:

    – Air Handling Unit
    – Lighting Controls
    – Electric Water Heater

  5. Edificio Cuauhtemoc

    Comments Off on Edificio Cuauhtemoc

    New Office Tower Atop a Parking Garage with 10,763 SF of Retail Space and a 5,382 SF Banco Santander Branch
    Pre-Certified LEED Platinum