Category Archive: Science & Technology

  1. Dow

    Comments Off on Dow
  2. Halliburton Technology Center North Belt Campus

    Comments Off on Halliburton Technology Center North Belt Campus

    210,000 SF  New Building on Existing Campus Including:

    •95,000 GSF, Laboratory Areas
    •115,000 GSF, Offices/Support Spaces
    •4,000 SF, Director’s Area
    •Service Dock
    •Pursuing LEED® NC 2.2 Silver Certification

  3. The DOW Chemical Company, The Texas Innovation Center

    Comments Off on The DOW Chemical Company, The Texas Innovation Center

    ± 50 Acres,Full MEP Engineering Services for a New Research & Development Campus for Laboratory & Offices Including:

    • 291,591 GSF, Wet Chemistry Laboratory Building 1 Including:
    – 56 Laboratory Modules, Each Approx. 2,070 GSF with 12 “Specialty” Lab Modules
    – Break Rooms, Chemical Storage, Office Space, IT Rooms & Other Miscellaneous Areas
    • 277,191 GSF, Wet Chemistry Laboratory Building 2 Including:
    – 56 Laboratory Modules, Each Approx. 2,070 GSF with 12 “Specialty” Lab Modules
    – Break Rooms, Chemical Storage, Office Space, IT Rooms & Other Miscellaneous Areas
    • 60,000 GSF, Amenities Building Including:
    – Fitness Center, Cafeteria, Conference Center, Training & Visitor’s Center
    • 40,000 GSF, Hazardous Storage Building/Warehouse Including:
    – Future H3 Occupancy Classification
    – Crane Served, High-Piled Storage, Gas Suppression System
    – Provisions for Future Expansion
    – 25,000 GSF, Central Plant
    • Site & Infrastructure Work Including:
    – Roadway Lighting, Dry Utility Distribution, Central Distribution of Chilled Water,
    – Interceptors, Canopies, Guard Booths & Lift Station(s)
    • Pursuing LEED® Gold Certification

  4. Kraton Polymers, LLC

    Comments Off on Kraton Polymers, LLC

    92,907 SF, Total Space Including:

    • 22,000 SF, Lab Area with 5 Different Types of Labs Including:
         – Materials Lab
         – Applications Lab 1, 2 & 3
         – Wet Chemicals Lab
    • Ancillary Spaces Including:
         – Storage
         – Equipment Rooms
         – Corridors
         – Offices, etc.
    • Cafeteria & Small Residential Kitchen
    • IT Equipment Room with Dedicated Air Conditioning
    • Natural Gas Generator
    • Heating Hot Water Boilers

  5. UT MDAnderson Cancer Center, Carcinogenesis Research Lab 4

    Comments Off on UT MDAnderson Cancer Center, Carcinogenesis Research Lab 4

    23,200 SF, New Research Building Including:

    • 16,300 SF, Laboratory Space
    • 4,600 SF, Office/Administration Space
    • 2,300 SF, Building Support Space
    • Central Plant Study & Report
    • 220 Ton Air Cooled Chiller Addition & Heating System Modifications
    • New Central Plant
    • 12 kV Power Distribution Upgrade
    • Emergency Diesel Generator Relocation

  6. Halliburton/Multi-Chem

    Comments Off on Halliburton/Multi-Chem

    26,460 GSF, Renovations and Build-outs for Existing Space Including:

    • 15,300 SF, Offices, Conference Space, Public Areas, Restroom & Training Lab
    • 11,340 SF, PE Lab Area Build-Out Including:
         – H2S Corrosion Lab
         – H2S Fluids ID Lab
         – Fracture Conductivity Lab
         – Work Areas, Office and Other Support Spaces