Category Archive: Uncategorized

  1. Halliburton Life Center

    Comments Off on Halliburton Life Center

    131,000 SF,  New Building Addition to Existing Campus Including:

    • 34,000 GSF, Corporate Conference Center with Pre-Function Area
    • 26,000 GSF, Fitness Center with:
         – Regulation Size Basketball Court
         – Aerobics
         – Spinning
         – Weights
         – Locker Rooms
    • 18,000 GSF, Cafeteria
    • 40,000 GSF, Training Rooms & Labs
    • 12,000 GSF, Service Dock & Support Spaces
    • LEED® NC 2.2 Gold Certification

  2. Kelsey-Seybold Clinic – The Woodlands

    Comments Off on Kelsey-Seybold Clinic – The Woodlands

    Kelsey-Seybold Clinic – Katy, Texas

    36,500 SF, New Construction

    MEP Acceptance Testing, Pre-Functional Checklist Development, Functional Test Development and Execution and Summary Report

    • HVAC Systems:
         – 2 60-Ton Rooftop Units
         – 8 Air Terminal Units
         – 3 Exhaust Fans
         – 1 Liebert Split System
         – 2 Daiken Split Systems
         – 2 Electric Water Heaters with Circulating Pump HVAC Systems

    Kelsey-Seybold Clinic – The Woodlands, Texas

    80,000 SF, New Construction

    MEP Acceptance Testing, Pre-Functional Checklist Development, Functional Test Development and Execution and Summary Report

    • HVAC Systems:
         – 3 60-Ton Rooftop Units
         – 13 Air Terminal Units
         – 3 Exhaust Fans
         – 2 Liebert Split Systems
         – 3 Daiken Split Systems
         – 2 Electric Water Heaters with Circulating Pump

  3. FMC Technologies Corporate Campus

    Comments Off on FMC Technologies Corporate Campus

    174 Acres,  Full MEP Engineering Services for a New Corporate Office and Manufacturing Campus

    • Including, but not Limited to:
         – 180,000 SF, Corporate Offices, Subsea Offices, 2 Wings, 6 Levels Each
         – 600,000 SF, Product Line Offices, 6 Levels with 2 Service Yards
         – 30,000 SF, Daycare
         – 20,000 SF, Dining
         – 12,000 SF, Fitness Center
         – Amenities & Training with Training Workshops, Training Yard, Outdoor Storage & 1 Service Yard

  4. The DOW Chemical Company

    Comments Off on The DOW Chemical Company

    ± 50 Acres  Full MEP Engineering Services for a New Research & Development Campus for Laboratory & Offices Including:

    • 291,591 GSF, Wet Chemistry Laboratory Building 1 Including:
         – 56 Laboratory Modules, Each Approx. 2,070 GSF with 12 “Specialty” Lab Modules
         – Break Rooms, Chemical Storage, Office Space, IT Rooms & Other Miscellaneous Areas
    • 277,191 GSF, Wet Chemistry Laboratory Building 2 Including:
         – 56 Laboratory Modules, Each Approx. 2,070 GSF with 12 “Specialty” Lab Modules
         – Break Rooms, Chemical Storage, Office Space, IT Rooms & Other Miscellaneous Areas
    • 60,000 GSF, Amenities Building Including:
         – Fitness Center, Cafeteria, Conference Center, Training & Visitor’s Center
    • 40,000 GSF, Hazardous Storage Building/Warehouse Including:
         – Future H3 Occupancy Classification
         – Crane Served, High-Piled Storage, Gas Suppression System
         – Provisions for Future Expansion
         – 25,000 GSF, Central Plant
    • Site & Infrastructure Work Including:
         – Roadway Lighting, Dry Utility Distribution, Central Distribution of Chilled Water,
         – Interceptors, Canopies, Guard Booths & Lift Station(s)
    • Pursuing LEED® Gold Certification

  5. Malabo Dos – Noble Energy Campus

    Comments Off on Malabo Dos – Noble Energy Campus

    20 Acres, Multi-Building Campus Including:

    • Residential/Office Building:
         – Indoor/Outdoor Café
         – Coffee/Break Room
         – Conference Room
         – Data Center with Satellite Up-link
         – Men’s & Women’s Locker & Shower Rooms
         – Open & Closed Office Space & Conference Rooms
         – Residential Units
         – Laundry & Housekeeping Rooms
         – Resident’s Storage & Lounge
         – One 2-Story Apartment Building Consisting of 12 Residential Dwellings
         – Six 2-Story Duplex Buildings Consisting of Two 3-Bedroom Dwellings
         – Site Infrastructure to Accommodate an Additional 6 Future Duplex Buildings
    • Visitor’s Center:
         – Waiting & Reception Areas
         – Guard House & Security Check-in Areas
         – Perimeter Lighting & Security Cameras
         – Recreation Center
         – Clinic Building:
         – Medical Clinic
         – Fitness Center
         – Outdoor Saltwater Pool
         – Game Room
         – Patio
    • Warehouse Building:
         – Storage
         – Laundry
         – Assembly Room
         – Lounge
    • Industrial Generator & Maintenance Building:
         – 4 Generator Rooms
         – Switchgear Room
         – Water Treatment Room
         – Office
         – Maintenance Shop
         – Electrical Power Distribution & Information Technology Conduit Pathways
         – Design of Liquefied Petroleum Gas Storage & Distribution System for Generator Bi-Fuel Operation
         – Outdoor Basketball & Tennis Courts
         – Exterior Lighting
         – Water Feature Engineering

  6. UTMDAnderson Cancer Center

    Comments Off on UTMDAnderson Cancer Center

    23,200 SF, The Science Park-Research Division Carcinogenesis Research Lab 4 Including:

    • 16,300 SF, Laboratory Space
    • 4,600 SF, Office/Administration Space
    • 2,300 SF, Building Support Space
    • Central Plant Study & Report
    • 220 Ton Air Cooled Chiller Addition & Heating System Modifications
    • New Central Plant
    • 12 kV Power Distribution Upgrade
    • Emergency Diesel Generator Relocation

  7. Memorial Hermann Heart & Vascular Institute Southwest

    Comments Off on Memorial Hermann Heart & Vascular Institute Southwest

    145,000 SF, 5-Story Building Including:

    • Non-Invasive Diagnostic Center
    • Pharmacy
    • Catheterization Labs
    • Electrophysiology Labs
    • Ultra High Tech OR Suites
    • Advanced Cardiac Cath Lab
    • Cardiac MRI Unit
  8. North Wynden Office Building

    Comments Off on North Wynden Office Building

    11-Story, Office Building Including:

    • Ground Floor Restaurant & Retail Space
    • Fitness Center
    • Meeting Spaces for Tenant Use
    • 313,000 GSF, 3-Level, Below-Grade Parking Garage for 878 cars
    • Pursuing LEED® Certification
  9. Twenty-Two Waugh Drive

    Comments Off on Twenty-Two Waugh Drive

    221,425 SF,  New Office Building Including:

    • 2,000 SF, Lobby
    • 2,700 SF, On-Site Retail
    • 13,000 SF Outdoor Terrace
    • Rooftop Outdoor Terrace
    •  Pursuing LEED® Silver or Gold Certification
    • 320,000 SF, Parking Garage
  10. Kelsey-Seybold Clinic – Katy, Texas

    Comments Off on Kelsey-Seybold Clinic – Katy, Texas
    • HVAC Systems:
      • 2 60-Ton Rooftop Units
      • 8 Air Terminal Units
      • 3 Exhaust Fans
      • 1 Liebert Split System
      • 2 Daiken Split Systems
      • 2 Electric Water Heaters with Circulating PumpHVAC Systems

    MEP Acceptance Testing, Pre-Functional Checklist Development, Functional Test Development and Execution and Summary Report

     

  11. Indian Springs Office and Restaurant Complex

    Comments Off on Indian Springs Office and Restaurant Complex

    The Woodlands, Texas 99,100 SF

    Total Complex Including:

    – 24,800 SF, Office Building Component, Two 1-Story Towers, Including:

    Core & Shell MEP Systems
    MEP Systems for Building’s Lobbies
    – 24,000 SF, Professional Office Building Component, Including:

    10,000 SF, Full Fit-Out for St. Luke’s Emergency Clinic
    – 16,500 SF, Restaurant Component, Three Restaurant Buildings, Including:

    Core & Shell MEP Systems
    MEP Systems for all Food Prep Areas
    Outdoor Electrical Systems
    Design of Electrical and Plumbing Infrastructure Support Systems Serving the Courtyard Pool
    Lighting for Site/Surface Parking
    – 2,020 SF, MEP Systems for Music Pavilion

    Completed Through Construction Documents