alliantgroup Office Building

Houston, Texas

305,000 GSF, New Construction

Commissioning Plan Development, Commissioning Specifications Development, Pre-Functional Checklist Development, Functional Test Development, LEED® Fundamental Commissioning Services for Core and Shell

• HVAC System:
     – Stair Pressurization Fans
• Electrical System:
     – Switchgear, Bus Risers, Transformers and Panels, & Motor Control Centers
     – Fire Alarms
     – Lightning Protection
     – Ground Fault Protection and Setting
     – Generator, Automatic Transfer Switch
• Plumbing System:
     – Domestic Water Pumps, Pressure Relief Valves, Water Closets and Urinals
     – Faucets and Hose Bibs
• Fire Protection:
     – Sprinkler Controls Rigs on each Floor/Standpipe, Fire Pump and Jockey Pump, Dry Pipe System
• Low Voltage:
     – Security Locks and Door Positioning, Cameras