Memorial Hermann Southwest POB IV

Houston, Texas

145,000 SF, New Construction

Cx Plan Development, Cx Specifications Development, Design Review, Submittal Review, Pre-Functional Checklist Development, Functional Test Development and Execution, O&M Training Facilitation, and Post Occupancy Cx.

• HVAC System:
     – Chilled Water Plant
     – Air Distribution System
• Electrical Systems:
     – Electrical System Power
     – Emergency Power Systems
• Life Safety Systems:
     – Fire alarm system
     – Fire Smoke/Damper